What the filing says
A public-record reading of the proposed work.
Plumbing work in conjunction with REPAIR BUILDING FROM FIRE DAMAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1891, with 10 homes, on a 1,900 sq ft lot.
- Built
- 1891
- Last altered
- 2000
- Floors
- 4
- Residential units
- 10
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R8B
- Lot area
- 1,900 sq ft
- Building area
- 6,660 sq ft
- Historic district
- Upper West Side / Central Park West Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 14 notices on file; the most recent was issued Oct 2, 2025.
- Construction
Issued Oct 2, 2025 — EMERGENCY WORK ORDER.@TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DSREPAIR DUE TO FIRE W/MODERATE CHARRNG OF ROOF JOISTS BENEATH PENTHOUSE,SOME CHARRNG OF RELIEVING WALL ON 4THFL,PENTHOUSE.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #082625FEU10704AK (CONTROL # 341629) IMMEDIATELY
- Construction
Issued Aug 26, 2025 — FAILURE TO MAINTAIN.@TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR DUE TO FIRE W/MODERATE CHARRNG OF ROOF JOISTS BENEATH PENTHOUSE,SOME CHARRNG OF RELIEVNG WALL ON 4THFL,PNTHSE&STAIR.OWNR TO ENGAGE A NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT FILE FOR PRMTS BY 10/27/25.SGN OFF RPAIRS
- Construction
Issued Aug 26, 2025 — EMERGENCY WORK ORDER.@TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR DUE TO FIRE W/MODERATE CHARRNG OF ROOD JOISTS BENEATH PENTHOUSE,SOME CHARRNG OF RELIEVNG WALL ON 4THFL,PENTHOUSE.OWNR TO IMMED ENGAGE A NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&IMMED STBLZE& MAKE TEMP WEATHRTGHT THE BLDG.SHORE ROOF
2 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01353789-S3.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01353789-S3
- BIN
- 1028724
- BBL
- 1011270048
- Postal code
- 10023 · 304 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 10
- Proposed dwelling units
- 10