NYC DOB record · B01208231-I1

280 Linden Boulevard

280 Linden Boulevard, Brooklyn, NY 11226

Alteration filing in East Flatbush-Erasmus, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 23, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01208231-I1

280 Linden Boulevard

Brooklyn, NY 11226

Alteration filing · status dated Oct 21, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
8
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01208231-I1 as a alteration filing at 280 Linden Boulevard, Brooklyn, NY 11226. Its latest published status category is Recorded as completed, dated Oct 21, 2026. The filing records 8 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 21, 2026
Proposed scale
8 proposed dwelling units
Applicant of recordSee the 192 filings that name Nikolai Katz Architect
FiledApr 21, 2025
Current recordRecorded as completed
Proposed scale8 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of a temporary wooden construction fence

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 2019, with 8 homes, on a 3,150 sq ft lot.

Built
2019
Last altered
2019
Floors
4
Residential units
8
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7-1
Lot area
3,150 sq ft
Building area
6,916 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 14 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01208231-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01208231-I1
BIN
3108506
BBL
3048680027
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
8