NYC DOB record · M01342629-S2

281 11 Avenue

281 11 Avenue, Manhattan, NY 10001

Alteration filing in Chelsea-Hudson Yards, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01342629-S2

281 11 Avenue

Manhattan, NY 10001

Alteration filing · status dated Oct 1, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01342629-S2 as a alteration filing at 281 11 Avenue, Manhattan, NY 10001. Its latest published status category is Approved, dated Oct 1, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 1, 2026
Proposed scale
Not stated in this filing
The building, not the filingEvery filing at BIN 1080275, with the parcel and violation recordApplicant of recordSee the 5 filings that name LiRo-Hill
FiledJun 30, 2026
Current recordApproved
Proposed scaleNot specified
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Removal of existing gas piping serving heating and plumbing equipment. Installation of electric air-source heat pump for domestic hot water

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a utility property on a 151,974 sq ft lot.

Residential units
0
Building type
Utility property
Land use
Transportation and utility
Zoning district
M2-3
Lot area
151,974 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01342629-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01342629-S2
BBL
1006740001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0