NYC DOB record · B00915264-I1

2820 Ocean Parkway

2820 Ocean Parkway, Brooklyn, NY 11235

Alteration filing in Coney Island-Sea Gate, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00915264-I1

2820 Ocean Parkway

Brooklyn, NY 11235

Alteration filing · status dated Sep 22, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
172
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00915264-I1 as a alteration filing at 2820 Ocean Parkway, Brooklyn, NY 11235. Its latest published status category is Recorded as completed, dated Sep 22, 2026. The filing records 172 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 22, 2026
Proposed scale
172 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3320735Applicant of recordSee the 1449 filings that name Ashraf Corp
FiledAug 7, 2023
Current recordRecorded as completed
Proposed scale172 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of 408' new sidewalk shed at 2820 ocean parkway, as indicated on plans. there will be no change in the use, egress, or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 24-story elevator apartment building built in 1962, with 1547 homes, on a 539,730 sq ft lot.

Built
1962
Floors
24
Residential units
1547
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
539,730 sq ft
Building area
1,800,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 74 notices on file; the most recent was issued Feb 29, 2024.

  • Construction

    Issued Feb 29, 2024 — PARTIAL VAC ORD-UNSAFE CONDITION OBSERVED AT BALCONIES&TERRACE AT EXP 1,2,3&4.BALCONY ARE CRACKED/SPALL CONCRETE W/EXPOSED REINFORCEMENT & LOOSE CONCRETE @BALCONY UNDERSIDE.AREAS OF CRACKED BLASS COMPONENTS @ BALC &TERRACE@EXP1,2,3&4 UNABLE TO BE OCCUPIED.REMEDY:VACATE ALL BALCONIES & TERRACES ON EXP 1,2,3 & 4

  • Construction

    Issued Feb 29, 2024 — FAILURE MAINTAIN BLDG IN CODE-COMPLIANT.ON 2/29/24 CRACKED GLASS BALCO NY RAIL.SPALL/CRACKED CONCRETE BALCOLN.SLABS, REINFORC IS EXPOSED @ LOCATIONS.REMEDY:IMMED RETAIN NYSPE W/GLASS RAIL SYS EXPER&CONCRETE BALCONIES EXP TO INSPECT&EVAL 100% @ALL EXPS.FILE&PERMIT WORK.SUBMITPE REPORT TO FACADES@BUILDINGS.NYC.GOV NO LATER THAN 3/20/2024

  • Construction

    Issued Feb 29, 2024 — EMER WRK ORD-UNSAFE COND @ BALCONIES&TERRACE AT EXP1,2,3&4.BALCONY ARE CRACK/SPALL CONC WITH EXP REINFORC&LOOSE CONCRETE@BALCONY/MULT ARES OF CRACK GLASS COMP@BALC RAILINGS.THESE CONDS HAVE MADE BALCON@EXP1,2,3&4 ATEX1 LATERAL CRACK BRK.REMEDY:IMMEDIATE PROVIDE SAFE MEAS SECURE & PR OTECT.UNDER SUPERV OF LIC PROF. REMOVE ALL LOOSE MATERIALS

  • 6 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00915264-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00915264-I1
BBL
3072530001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
172
Proposed dwelling units
172
Sidewalk shed