NYC DOB record · B01418218-I1

2824 Plumb 3 Street

2824 Plumb 3 Street, Brooklyn, NY 11235

Alteration filing in Sheepshead Bay-Manhattan Beach-Gerritsen Beach, Brooklyn. The latest DOB status is chief plan examiner/ assistant chief plan examiner review.

A senior plan examiner is reviewing the application. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 30, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01418218-I1

2824 Plumb 3 Street

Brooklyn, NY 11235

Alteration filing · status dated Sep 25, 2026

Current record
Under review
Proposed scale
2 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01418218-I1 as a alteration filing at 2824 Plumb 3 Street, Brooklyn, NY 11235. Its latest published status category is Under review, dated Sep 25, 2026. The filing records 2 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 25, 2026
Proposed scale
2 proposed stories
Applicant of recordSee the 16 filings that name HLZAE, Inc.
FiledSep 23, 2026
Current recordUnder review
Proposed scale2 stories
Recorded cost$635,250

What the filing says

A public-record reading of the proposed work.

Repairs of existing parking structure. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story garage or fuel station built in 2000, on a 60,550 sq ft lot.

Built
2000
Floors
3
Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
C3
Lot area
60,550 sq ft
Building area
150,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 24 notices on file; the most recent was issued Jun 23, 2024.

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)

  • Failure to submit

    Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2022

  • Failure to post energy

    Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01418218-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01418218-I1
BIN
3256973
BBL
3088420280
Review type
Standard Plan Examination
Existing stories
2
Proposed stories
2
Existing dwelling units
0
Proposed dwelling units
0
General constructionStructural work