What the filing says
A public-record reading of the proposed work.
Filing Plumbing work only in conjunction with ALT2#340780382 to address WWP plumbing conditions & Violation# 39025374Z.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1920, on a 2,504 sq ft lot.
- Built
- 1920
- Last altered
- 2020
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R6B
- Lot area
- 2,504 sq ft
- Building area
- 1,800 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 2 notices on file; the most recent was issued Jul 14, 2020.
- Construction
Issued Jul 14, 2020 — FTM:BLDG RENOVATD/ALTERED W/O PRMT EXT'R WALLS STATE DISRPR.CRCKS EXP1 (FRONT)&EXP3(REAR)WALLS.BRCK EXPOSED @INT'R DETERIOR BRCKS&MORTAR&OPEN JOINTS THR-OUT EXP2(EAST)&EXP3 WALLS.UNFRAMED OPENGS@WALL&OUTWRD BULGE @TOP CHIM@EXP2 WALLS.NYSPE IMMED EVALU ENTIRE BLDG PROVIDE REPRS UNDER PERMT PER PE EVALU.FILE BY 8/28/20.START BY 9/14/20&SIGNOFF BY 12/7/20
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00467430-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00467430-I1
- BBL
- 3008730031
- Postal code
- 11215 · 2962 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








