NYC DOB record · M01270755-S5

284 Dyckman Street

284 Dyckman Street, Manhattan, NY 10034

Alteration filing in Washington Heights (North), Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01270755-S5

284 Dyckman Street

Manhattan, NY 10034

Alteration filing · status dated Aug 20, 2026

Current record
Recorded as completed
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01270755-S5 as a alteration filing at 284 Dyckman Street, Manhattan, NY 10034. Its latest published status category is Recorded as completed, dated Aug 20, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 20, 2026
Proposed scale
1 proposed story
FiledApr 7, 2026
Current recordRecorded as completed
Proposed scale1 stories
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Application filed for emergency shoring as per DOB directive and plans here within.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story garage or fuel station built in 1926, on a 16,225 sq ft lot.

Built
1926
Floors
2
Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
C8-3
Lot area
16,225 sq ft
Building area
32,440 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 19 open notices on record for this building, out of 22 notices on file; the most recent was issued Apr 3, 2026.

  • Construction

    Issued Apr 3, 2026 — FAILURE TOMAINTAIN BLDG IN CODE COMPLIANT MANNER. A TWO STORIES PARKIN G GARAGE CONSISTING OF BSMT 1FL LEVEL HAS A PARTIAL COLLAPSE OCURRED ON 3/16/26 AS ONE STEEL FILLER BEAM ON THE FIRST LEVEL COLLAPSED ALONG WITH A PORTION OG THE ADJOINING SLAB ON THE BSMT SLAB ON GRADE. REMED Y OWNER TO RETAIN NYSPE TO EVALUATE THE ENTIRE P.S. AND FILE DRAWING

  • Construction

    Issued Apr 3, 2026 — FAILURE TO MAINTAIN BLDG IN CODE COMPLAINCE MANNER.2 STORY PARKING GAR AGE CONSISTING OF BSMT AND 1 FL HAS A PARTIAL COLLAPSE OCCURED ON 3/16 /26

  • Failure to

    Issued May 2, 2024 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • 16 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01270755-S5.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01270755-S5
BIN
1065048
BBL
1022460036
Review type
Professional Certification
Existing stories
1
Proposed stories
1
Existing dwelling units
0
Proposed dwelling units
0
Structural work