NYC DOB record · B00634895-I1

2875 West 8 Street

2875 West 8 Street, Brooklyn, NY 11224

Alteration filing in Coney Island-Sea Gate, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00634895-I1

2875 West 8 Street

Brooklyn, NY 11224

Alteration filing · status dated Dec 8, 2021

Current record
Approved
Proposed scale
30 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00634895-I1 as a alteration filing at 2875 West 8 Street, Brooklyn, NY 11224. Its latest published status category is Approved, dated Dec 8, 2021. The filing records 30 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 8, 2021
Proposed scale
30 proposed stories
The building, not the filingwhat it sold for and every filing at BIN 3196590Applicant of recordSee the 333 filings that name J&r Design And Inspection CORP.
FiledDec 4, 2021
Current recordApproved
Proposed scale30 stories
Recorded cost$22,000

What the filing says

A public-record reading of the proposed work.

General renovation of existing store with repairing partition, new floor tiles, partitions, replace drop ceiling tiles, painting and mechanical work as per plan. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story office building built in 1946, on a 58,960 sq ft lot.

Built
1946
Last altered
1993
Floors
1
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C8-2
Lot area
58,960 sq ft
Building area
50,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00634895-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00634895-I1
BBL
3072790153
Review type
Professional Certification
Existing stories
30
Proposed stories
30
Existing dwelling units
0
Proposed dwelling units
0
General constructionmechanical