What the filing says
A public-record reading of the proposed work.
Remove existing 200kw turbine generator and existing 350kwdiesel engine on first floor. remove existing interior partitionsin order to enlarge room for new electrical switch gear.provide new steel roof dunnage for new 800kw rooftopgenerator with enclosure
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a utility property on a 21,208 sq ft lot.
- Residential units
- 0
- Building type
- Utility property
- Land use
- Transportation and utility
- Zoning district
- R4
- Lot area
- 21,208 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 18 notices on file; the most recent was issued Apr 7, 2025.
- Immediate
Issued Apr 7, 2025 — ERECT 90FT OF SWS AT EXP#1 (OCEAN AVENUE) TO SAFEGUARD THE PUBLIC AND PROPERTY
- Construction
Issued Feb 22, 2001 — WORK WITHOUT A PERMIT. UPON INSPECTION OF ABOVE PREMISES THE CURB AT THE N.W. SIDE OF EAST 21ST ST. & AVENUE Y WAS CUT & D.O.B. RECORDS INDICATES NO PERMIT WAS ISSUED
- Local law 10/81 -
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 8, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01239927-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 77,401 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01239927-I1
- BBL
- 3074220136
- Postal code
- 11235 · 1870 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0