NYC DOB record · Q00614075-P7

29-10 Northern Boulevard

29-10 Northern Boulevard, Queens, NY 11101

New building filing in Queensbridge-Ravenswood-Dutch Kills, Queens. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 30, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00614075-P7

29-10 Northern Boulevard

Queens, NY 11101

New building · status dated Sep 25, 2026

Current record
Approved
Proposed scale
49 stories
Dwelling units
593
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00614075-P7 as a new building at 29-10 Northern Boulevard, Queens, NY 11101. Its latest published status category is Approved, dated Sep 25, 2026. The filing records 49 proposed stories and 593 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 25, 2026
Proposed scale
49 proposed stories and 593 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 4624330Applicant of recordSee the 8 filings that name Cetraruddy Architecture DPC
FiledJun 25, 2026
Current recordApproved
Proposed scale49 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

New Building Construction

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 46-story elevator apartment building built in 2025, with 560 homes, on a 27,553 sq ft lot.

Built
2025
Floors
46
Residential units
560
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
M1-6/R10
Lot area
27,553 sq ft
Building area
510,543 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 5 notices on file; the most recent was issued Nov 16, 2009.

  • Construction

    Issued Nov 16, 2009

  • Construction

    Issued Mar 10, 2008

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00614075-P7.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00614075-P7
BBL
4002390006
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
49
Existing dwelling units
Empty in the source
Proposed dwelling units
593
General construction