NYC DOB record · Q01387966-I1

29-11 39 Avenue

29-11 39 Avenue, Queens, NY 11101

Alteration filing in Queensbridge-Ravenswood-Dutch Kills, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01387966-I1

29-11 39 Avenue

Queens, NY 11101

Alteration filing · status dated Sep 24, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
62
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01387966-I1 as a alteration filing at 29-11 39 Avenue, Queens, NY 11101. Its latest published status category is Approved, dated Sep 24, 2026. The filing records 62 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 24, 2026
Proposed scale
62 proposed dwelling units
Applicant of recordSee the 641 filings that name Always Fast Services Corp
FiledApr 16, 2026
Current recordApproved
Proposed scale62 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary construction fence as per plans. no change in use, occupancy or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story hotel built in 2011, on a 4,958 sq ft lot.

Built
2011
Floors
9
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
M1-2/R5D
Lot area
4,958 sq ft
Building area
28,350 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 35 notices on file; the most recent was issued Oct 27, 2025.

  • Construction

    Issued Oct 27, 2025 — FAILURE TO MANTAIN BUILDING IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED CRACKED STUCCO AND DEFECTED BALCONY SLAB AT EXP 1 AND EXP 3. REMEDY: REPAIR AND OR REPLACE

  • Construction

    Issued Mar 7, 2022 — PARTIAL VACATE ORDER-OBSERVED DETERIORATED/LOOSE BALCONY SHEATHING, STUDS AND CLADDING AT VARIOUS FLOORS OF EXP 1 SOUTH ELEVATION AND EXP 3 NORTH ELEVATIONS. DUE TO THESE IMMINENT HAZARDOUS CONDITIONS OF BALCONIES PARTILA VACATE OF ALL BALCONIES. REMEDY:VACATE ALL BALCONIES AT EXP 1 SOUTH ELEV AND EXP 3 NORTH ELEVATION

  • Construction

    Issued Mar 3, 2022 — AS PER CONDITIONS ON SOUTH ELEVATION EXP #1 AND NORTH ELEVATION EXP #3 DEFECTIVE BALCONY SLABS AND STRUCTURE. REMEDY: OWNER TO IMMED RETAIN A NYS LIC PROF TO PERFORM 1 100% HANDS ON INSPECTION OF ALL EXTERIOR BALCONIES AND PROVIDE REPAIR PLANS AND PROPSAL SUBMITTED TO DOB FACADE UNIT BY 4/3/2022

  • 7 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01387966-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01387966-I1
BIN
4540472
BBL
4003840031
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
62
Proposed dwelling units
62