What the filing says
A public-record reading of the proposed work.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story elevator apartment building built in 1928, with 103 homes, on a 9,411 sq ft lot.
- Built
- 1928
- Last altered
- 1996
- Floors
- 12
- Residential units
- 103
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- M1-6/R10
- Lot area
- 9,411 sq ft
- Building area
- 96,456 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 137 notices on file; the most recent was issued Apr 15, 2026.
- Construction
Issued Apr 15, 2026 — EMERGENCY WORK ORDER DUE TO CRACKING TERRA-COTTA MASONRY DECOR # EXP#2 SOUTH ELEV (SW CORNER)9FL TERRACE AREA).TERRA-COTTA CONDITION IS POTENTIAL TO IMPACT TO PUBLIC STREET SIDE OF 29 STREET OF FALLEN DEBRIS. REMEDY:OWNER TO IMMEDIATELY PROVIDE ADEQUATE SAFE MEAS UNDER DIRECTION/SUPERVISION OF NYS REGISTERED LICENSED PROFESSIONAL
- Construction
Issued Apr 15, 2026 — FAILURE TO MAINTAIN BUILDING WALLS IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED CRACKING TERRA-COTTA MASONRY DECOR AT EXPOSURE 2 SODUTH ELEVATIONS (SW CORNER/ 9TH FLOOR TERRACE AREA) REMEDY: OWNER TO REPAIR AND/OR REPLACE
- Fail to certify class
Issued Jun 26, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
10 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01306759-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01306759-I1
- BBL
- 4004180014
- Postal code
- 11101 · 511 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 103
- Proposed dwelling units
- 103








