What the filing says
A public-record reading of the proposed work.
Fence application filed in conjunction with new building job #q01197266.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story office building built in 1931, on a 4,890 sq ft lot.
- Built
- 1931
- Floors
- 2
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-3/R7X
- Lot area
- 4,890 sq ft
- Building area
- 9,200 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 55 notices on file; the most recent was issued Mar 25, 2026.
- Construction
Issued Mar 25, 2026 — MECHANICAL DEMO WAS PERFORMED CONTRARY TO APPROVED CONSTRUCTION DOCS 85% OF STRUCTURE REMAINS. REMEDY: COMPLY WITH REQUIREMENTS OF BC 3310 AND COMMISSIONER'S ORDER 03-17-2026
- Local law 10/81 -
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01223961-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 68,520 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01223961-I1
- BIN
- 4004861
- BBL
- 4004020010
- Postal code
- 11101 · 414 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 43
- Proposed dwelling units
- 43