What the filing says
A public-record reading of the proposed work.
Installation of radon mitigation system in the sub slab with exhaust fans on the roof
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story warehouse built in 1931, on a 29,943 sq ft lot.
- Built
- 1931
- Floors
- 2
- Residential units
- 0
- Building type
- Warehouse
- Land use
- Industrial and manufacturing
- Zoning district
- M3-1
- Lot area
- 29,943 sq ft
- Building area
- 35,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 11 notices on file; the most recent was issued Mar 16, 2026.
- Construction
Issued Mar 16, 2026 — EMERGENCY WORK ORDER.DUE TO FIRE THAT OCCURRED @ADJ PROPERTY 17 53 ST THE WEDT PARTY WALL W17 53RD ST DAMAGED&PARTIALLY COLLAPSED@TOP LEAVING ROOF UNSUPPORTED & WALL FREE STANDING.IMMED PARTIALLY DEMOLISH UNSUPPORTED SECTION OF ROOF APPROX 20'FROM PARTY WALL&DEMOLISH PARTY WALL TO A SAFE LEVEL
- Immediate
Issued Mar 12, 2026 — ERECT 112 LINEAR FT OF TIGHT BOARD CONSTRUCTION FENCE 20 FT OUT FROM BUILDING AS FOLLOWS, EXP 1, 36 FT AND RETURN BACK TO BUILDING 20 FT AT EXP 1,4 CORNER, EXP 3, 36 FT AND RETURN 20 FT BACK TO BUILDING AT EXP 3,4 CORNER TO SAFEGUARD THE PUBLIC AND PROPERTY
- Construction
Issued Mar 11, 2026 — STRUCTURE RENDERING NON-COMPLIANT DUE TO DAMAGE TO MASONRY PARTY WALL AT EXPOSURE #2 SHARED WALL WITH FIRE BUILDING.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00431212-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00431212-I1
- BIN
- 3013798
- BBL
- 3008030041
- Postal code
- 11232 · 1595 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0