NYC DOB record · M01394247-P1

29 West 35 Street

29 West 35 Street, Manhattan, NY 10001

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01394247-P1

29 West 35 Street

Manhattan, NY 10001

Alteration filing · status dated Oct 15, 2026

Current record
Approved
Proposed scale
12 stories
Dwelling units
107
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01394247-P1 as a alteration filing at 29 West 35 Street, Manhattan, NY 10001. Its latest published status category is Approved, dated Oct 15, 2026. The filing records 12 proposed stories and 107 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 15, 2026
Proposed scale
12 proposed stories and 107 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1015891Applicant of recordSee the 88 filings that name Severud Associates
FiledOct 14, 2026
Current recordApproved
Proposed scale12 stories
Recorded cost$195,120

What the filing says

A public-record reading of the proposed work.

Structural modifications and framing on floors Cel, 1-12 and Roof as per plans filed herewith. No changes in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story office building built in 1911, on a 6,419 sq ft lot.

Built
1911
Floors
12
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
M1-9A/R12
Lot area
6,419 sq ft
Building area
71,180 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 57 notices on file; the most recent was issued Mar 2, 2026.

  • Construction

    Issued Mar 2, 2026 — FTM BLDG. OBSERVED BOARDED WINDOW MULTIPLE FLOORS AT EXP 1: SPALLING BRICKS AT MULTIPLE LOCATIONS AND BOARDED WINDOW AT EXP 4. REMEDY: REPAIR AND/OR REPLACE WINDOW AND DAMAGED BRICKWORK

  • Construction

    Issued Feb 21, 2025 — FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND/OR APPURTENANCES IN C ODE COMPLIANT MANNER.AT TIME OF INSPECTION,IT WAS OBSERVED SPALLING ST UCCO AT EXP4 EAST ELEVATION.REMEDY:REPAIR AND/OR REPLACE

  • Failure to correct swarmp conditions (facade)

    Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01394247-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 82,285 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01394247-P1
BBL
1008370023
Review type
Professional Certification
Existing stories
12
Proposed stories
12
Existing dwelling units
0
Proposed dwelling units
107
Structural work