What the filing says
A public-record reading of the proposed work.
Repari fire/water damage, replace suspended ceiling tile, new finishes. No change in egress, use or occupancy as part of this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story store building built in 1922, on a 8,141 sq ft lot.
- Built
- 1922
- Floors
- 1
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- C4-4D
- Lot area
- 8,141 sq ft
- Building area
- 8,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 4 notices on file; the most recent was issued Aug 21, 2026.
- Construction
Issued Aug 21, 2026 — STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO ENTIRE STRUCTURE DUE TO FIRE THAT OCCURRED AT 31 WEST BURNSIDE AVENUE THE STRUCTURE MUST BE MANTAINED IN CODE COMPLIANT MANNER
- Construction
Issued Aug 21, 2026 — STRUCTURE RENDERED NON COMPLIANT AT TIME OF INPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO ENTIRE STRUCTRE DUE TO FIRE AT 31 WEST BURNS IDE AVENUE THE STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01457310-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01457310-I1
- BIN
- 2014160
- BBL
- 2031930033
- Postal code
- 10453 · 175 filings
- Review type
- Professional Certification
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0