NYC DOB record · M01301486-I1

290 West 147 Street

290 West 147 Street, Manhattan, NY 10039

Alteration filing in Harlem (North), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 18, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01301486-I1

290 West 147 Street

Manhattan, NY 10039

Alteration filing · status dated Oct 16, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
16
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01301486-I1 as a alteration filing at 290 West 147 Street, Manhattan, NY 10039. Its latest published status category is Approved, dated Oct 16, 2026. The filing records 16 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 16, 2026
Proposed scale
16 proposed dwelling units
Applicant of recordSee the 1527 filings that name Ashraf Corp
FiledOct 11, 2025
Current recordApproved
Proposed scale16 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1920, with 20 homes, on a 3,747 sq ft lot.

Built
1920
Last altered
1991
Floors
5
Residential units
20
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7-2
Lot area
3,747 sq ft
Building area
12,765 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 6 notices on file; the most recent was issued Oct 6, 2025.

  • Construction

    Issued Oct 6, 2025 — OBSERVED CRACKED SPALLED PARAPET COATING,LOOSE STUCCO,OPEN MORTAR JOINTS,CRACKED TERRACOTTA COPING, RUSTED LINTELS,&DETERIORATED BRICKWORK WITH BULGING MISSING MORTAR.WATER INFILTRATION EVIDENT @SKYLIGHT WITH PEELING PAINT, DETERIORATED PLASTER,&FAILED ROOF FLASHING.CONDITIONS CREATE UNSAFE FA ADE AND POTENTIAL FALLING HAZARDS

  • Construction

    Issued Oct 6, 2025 — OBSERVED CRACKED SPALLED PARAPET COATING,LOOSE STUCCO,OPEN MORTAR JOINTS,CRACKED TERRACOTTA COPING, RUSTED LINTELS,&DETERIORATED BRICKWORK WITH BULGING MISSING MORTAR.WATER INFILTRATION EVIDENT @SKYLIGHT WITH PEELING PAINT, DETERIORATED PLASTER,&FAILED ROOF FLASHING.CONDITIONS CREATE UNSAFE FA ADE AND POTENTIAL FALLING HAZARDS

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01301486-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01301486-I1
BIN
1060514
BBL
1020320058
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
16
Proposed dwelling units
16
Sidewalk shed