NYC DOB record · M01446693-I1

291 Broadway

291 Broadway, Manhattan, NY 10007

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 9, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01446693-I1

291 Broadway

Manhattan, NY 10007

Alteration filing · status dated Sep 3, 2026

Current record
Approved
Proposed scale
19 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01446693-I1 as a alteration filing at 291 Broadway, Manhattan, NY 10007. Its latest published status category is Approved, dated Sep 3, 2026. The filing records 19 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 3, 2026
Proposed scale
19 proposed stories
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1001649Applicant of recordSee the 13 filings that name Ivan Shcherbakov
FiledSep 2, 2026
Current recordApproved
Proposed scale19 stories
Recorded cost$650,000

What the filing says

A public-record reading of the proposed work.

Interior non-structural demolition as shown on filed plans. No change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 19-story office building built in 1911, on a 7,650 sq ft lot.

Built
1911
Floors
19
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-4A
Lot area
7,650 sq ft
Building area
128,940 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 35 open notices on record for this building, out of 163 notices on file; the most recent was issued Jun 4, 2026.

  • Construction

    Issued Jun 4, 2026 — BOROUGH COMMISSIONER ORDER TO STOP WORK IMMEDIATELY DUE TO APPLICANT WITHDRAWAL OF APPLICATION #120296125 WAS ISSUED TO ENSURE THE SAFETY OF LIVES AND PROPERTIES.

  • Construction

    Issued May 19, 2026 — FTM BLDG WALL "S" & APPURTS. PARTIAL FACADE COLLPSE OCCURREDW/ ADDITN UNSF REMAINING ELEMNTS IDENTIFED. EMERGCY STABILIZTN EFFORTS & PBLIC SFTY MEAS PLACE SINCE INCIDENT IN SEPARATEPRORITY PHSES. REMDY: OWNR IS TO BE BEGIN PERMANET REPAIRS UNDR PERMIT BY 7/6/26. IN THEEVENT HZRDOUS CONDIT FOUND, IMMEDLY NOTIFY THE DEPT. MAINTS PBLIC SFTY MEAS

  • Construction

    Issued May 19, 2026 — FTM BLDG WALL "S" & APPURTS. PARTIAL FACDE COLLPSE OCCURRED W/ ADDIT UNSF REMAININ ELEMNTS IDENTIFED. OWNER TO CMPLETE INSTALLTN OFENGINRS ENCLSURE SYSTEM ON REMAING ELEVT BY 5/29/26. REMDY:PROVDE 2XWEEKLY UP DTES DURING PRORITY 2 PHSE. PROVDE S/S RPRT UPDTES EVERY 2 WEEKS UNTIL ALL OUTSTANDG ITEMS ARE CMPLETE & SIGND OFF.MAINTAN PBLIC PRTCTN MEAS

  • 32 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01446693-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,995 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01446693-I1
BBL
1001500038
Review type
Professional Certification
Existing stories
19
Proposed stories
19
Existing dwelling units
0
Proposed dwelling units
0
General construction