What the filing says
A public-record reading of the proposed work.
Erect an illuminated business accessory wall sign replacing permitted job x00017111. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story store building built in 1937, on a 28,250 sq ft lot.
- Built
- 1937
- Last altered
- 2017
- Floors
- 3
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- C4-4
- Lot area
- 28,250 sq ft
- Building area
- 100,126 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 85 notices on file; the most recent was issued Sep 21, 2026.
- Construction
Issued Sep 21, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITIONS W/EXTERIOR WALL AT EXP1/2 CORNER-LARGE VERT CRACKS TO MASONRY CMU WALL & ADDT'L CRACKS ALONG THE PARAPET WALL @ EXP2. OWNER TO IMMED RETAIN REG DISING PROF IN GOOD STANDING WITH DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 10/05/2026
- Local law 10/81 -
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01454846-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01454846-I1
- BBL
- 2023620044
- Postal code
- 10455 · 184 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








