What the filing says
A public-record reading of the proposed work.
Construction equipment - scaffold proposed installation of pipe scaffold for remedial repairs as per plans. pipe scaffold shall comply with chapter#33 of 2022 the ny building code. no change in use occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1937, with 31 homes, on a 9,375 sq ft lot.
- Built
- 1937
- Floors
- 6
- Residential units
- 31
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 9,375 sq ft
- Building area
- 40,509 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 41 notices on file; the most recent was issued Oct 24, 2025.
- Construction
Issued Oct 24, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#348167 VIO#081825PI20705HZ DATED 8/18/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 9/18/25 &START BLDG REPRS UNDER PERMIT BY 10/18/25&COMPLETED/SIGNED OFF BY 11/18/25.AS OF 10/23/25 A CAP&EVIDENCE OF COMPLETED REPR WORK NOT RECD IMMED COMPLY W/COMMISSIONER'S ORDER #348167 VIO#081825PI20705HZ
- Construction
Issued Aug 18, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD 2 EXP1/2 VERT STEP CRACKS UNDER WINDOWS & DETERIORATED WONDOW SILLS @ VARIOUS LOCATIONS. @ EXP3/4 STEP CRACK DETERIORATED MORTAR DISLEDGED BRICKS @ CORNDER EDGE REAR SIDE. OWNER TO IMMED RETAIN NYS-RA IN GOOD STANDING TO EVAL ENTIRE BLDG & TO SUBMIT A CORRECTIVE ACTION PLAN BY 9/18/25
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01409685-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01409685-S1
- BIN
- 2017207
- BBL
- 2033060042
- Postal code
- 10458 · 158 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 31
- Proposed dwelling units
- 31








