NYC DOB record · B00415651-I1

297 Wallabout Street

297 Wallabout Street, Brooklyn, NY 11206

Alteration filing in South Williamsburg, Brooklyn. The latest DOB status is filing withdrawn.

The applicant withdrew this filing, so it is not going forward. What every status means

Closed or withdrawnAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00415651-I1

297 Wallabout Street

Brooklyn, NY 11206

Alteration filing · status dated May 9, 2025

Current record
Closed or withdrawn
Proposed scale
Not stated
Dwelling units
7
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00415651-I1 as a alteration filing at 297 Wallabout Street, Brooklyn, NY 11206. Its latest published status category is Closed or withdrawn, dated May 9, 2025. The filing records 7 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Closed or withdrawn
Latest status date
May 9, 2025
Proposed scale
7 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3428688Applicant of recordSee the 595 filings that name A&d Engineering, PLLC
FiledNov 11, 2020
Current recordClosed or withdrawn
Proposed scale7 units
Recorded cost$2,000

What the filing says

A public-record reading of the proposed work.

Mechanical Systems filed in conjunction with New Building# 321598614

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 2 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00415651-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Filing Withdrawn.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00415651-I1
BBL
3022500045
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
7
Proposed dwelling units
7
mechanical