What the filing says
A public-record reading of the proposed work.
Full demolition of 2 story structure using hand held equipment.
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story place of worship built in 1910, on a 7,200 sq ft lot.
- Built
- 1910
- Floors
- 1
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R6B
- Lot area
- 7,200 sq ft
- Building area
- 6,800 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 16 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Jul 30, 2025 — STRUCTURE RENDERED NON COMPLIANT DUE TO VEHICLE IMPACTING SHED. AT TIME OF INSPECTION SHED WAS IN STATE OF DISREPAIR DUE TO TRUCK STRIKING STRUCTURE, APPROXIMATELY 32 LINEAR FEET OF PANELS WERE DISLODGED ALONG WITH BENT UPRIGHTS AND DAMAGED CABLES FOR LIGHTING.
- Construction
Issued Oct 2, 2024 — FTM.MASONRY PIER@1/2 CRNR WAS SPALLNG,CRCKD,BULGNG OUT,W/TREE GROWNG OUT TOP.VARIOUS SPALLNG@EXP1,3,&4 THROUGHOUT.TOP OF BELLTOWER ARE EXP 1/4 PRTLLY DTACHD W/TEMP NETTNG IN PLACE.MASONRY FLYING.IMMEDIATELY COMPLY W/COMMISSIONER'S ORDER #343188 (091423FEU30602PN)DATED 9/14/23 TO REPAIR THE BLDG UNDR PRMT
6 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01189961-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01189961-I1
- BIN
- 3020951
- BBL
- 3009750039
- Postal code
- 11215 · 2962 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- Empty in the source