NYC DOB record · B00105997-I1

298 St Nicholas Avenue

298 St Nicholas Avenue, Brooklyn, NY 11237

Alteration filing in Bushwick (East), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00105997-I1

298 St Nicholas Avenue

Brooklyn, NY 11237

Alteration filing · status dated Dec 28, 2020

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00105997-I1 as a alteration filing at 298 St Nicholas Avenue, Brooklyn, NY 11237. Its latest published status category is Recorded as completed, dated Dec 28, 2020. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 28, 2020
Proposed scale
Not stated in this filing
Applicant of recordSee the 566 filings that name Asif Jamil, RA
FiledDec 6, 2018
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of sidewalk shed and pipe scaffolding as per plans. pipe scaffolding and sidewalk shed live load 300 psf shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story two-family home built in 2018, on a 2,019 sq ft lot.

Built
2018
Last altered
2017
Floors
3
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R6
Lot area
2,019 sq ft
Building area
3,718 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00105997-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00105997-I1
BIN
3426521
BBL
3033380032
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source
Sidewalk shedScaffolding