What the filing says
A public-record reading of the proposed work.
Mod. to Verizon site. Remove 2 antennas, relocate 2 antennas, install 10 antennas, remove 4 RRHs, install 6 RRHs & 3 OVPs, relocate 2 & install 2 GPS, remove 1 cabinet and install 3 cabinets on new platform on roof. Railing filed under B00913117-S1
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1922, with 39 homes, on a 11,800 sq ft lot.
- Built
- 1922
- Floors
- 4
- Residential units
- 39
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 11,800 sq ft
- Building area
- 34,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 2 notices on file; the most recent was issued May 2, 2024.
- Failure to
Issued May 2, 2024 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00913117-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00913117-I1
- BBL
- 3086690093
- Postal code
- 11235 · 1835 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 39
- Proposed dwelling units
- 39