NYC DOB record · B00616526-I1

299 Stockholm Street

299 Stockholm Street, Brooklyn, NY 11237

New building filing in Bushwick (West), Brooklyn. The latest DOB status is filing withdrawn.

The applicant withdrew this filing, so it is not going forward. What every status means

Closed or withdrawnNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00616526-I1

299 Stockholm Street

Brooklyn, NY 11237

New building · status dated Nov 17, 2023

Current record
Closed or withdrawn
Proposed scale
4 stories
Dwelling units
8
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00616526-I1 as a new building at 299 Stockholm Street, Brooklyn, NY 11237. Its latest published status category is Closed or withdrawn, dated Nov 17, 2023. The filing records 4 proposed stories and 8 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Closed or withdrawn
Latest status date
Nov 17, 2023
Proposed scale
4 proposed stories and 8 proposed dwelling units
The building, not the filingapartment sizes, the owner of record and every filing at BIN 3430392Applicant of recordSee the 69 filings that name Sh Engineering PLLC
FiledNov 11, 2021
Current recordClosed or withdrawn
Proposed scale4 stories
Recorded cost$300,000

What the filing says

A public-record reading of the proposed work.

This application is filed for a new 4 story 8 family building. Structure ,Foundation and SOE.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4.5-story walk-up apartment building built in 2024, with 8 homes, on a 2,500 sq ft lot.

Built
2024
Floors
4.5
Residential units
8
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
2,500 sq ft
Building area
7,692 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00616526-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Filing Withdrawn.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00616526-I1
BBL
3032480053
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
8
General constructionStructural workFoundation workEarthwork