What the filing says
A public-record reading of the proposed work.
Alteration of exist duplex penthouse apt with new partition work, floor +clg finishes, modifications to masonry openings for window and door installations and installation of motorized awning. no change in use, egress or occupancy under this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 17-story condominium built in 1931, with 178 homes, on a 10,875 sq ft lot.
- Built
- 1931
- Last altered
- 1986
- Floors
- 17
- Residential units
- 178
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C1-6
- Lot area
- 10,875 sq ft
- Building area
- 132,846 sq ft
- Historic district
- Greenwich Village Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 26 notices on file; the most recent was issued Apr 30, 2020.
- Elevator
Issued Apr 30, 2020
- Elevator
Issued Apr 30, 2020
- Facade safety program
Issued Feb 21, 2017
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00902734-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00902734-I1
- BBL
- 1006257501
- Postal code
- 10014 · 576 filings
- Review type
- Standard Plan Examination
- Existing stories
- 17
- Proposed stories
- 17
- Existing dwelling units
- 178
- Proposed dwelling units
- 178