NYC DOB record · M00909753-I1

3 Times Square

3 Times Square, Manhattan, NY 10036

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00909753-I1

3 Times Square

Manhattan, NY 10036

Alteration filing · status dated Sep 30, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00909753-I1 as a alteration filing at 3 Times Square, Manhattan, NY 10036. Its latest published status category is Recorded as completed, dated Sep 30, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 30, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 143 filings that name Jaros Baum & Bolles
FiledSep 22, 2023
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$1.7M

What the filing says

A public-record reading of the proposed work.

Mechanical work in conjunction with new chillers as shown in plans.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 32-story condominium built in 1999, on a 29,630 sq ft lot.

Built
1999
Floors
32
Building type
Condominium
Zoning district
C6-7
Lot area
29,630 sq ft
Building area
1,049,600 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00909753-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00909753-I1
BIN
1024686
BBL
1010147501
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0