NYC DOB record · Q01360550-I1

30-71 21 Street

30-71 21 Street, Queens, NY 11102

New building filing in Old Astoria-Hallets Point, Queens. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 31, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01360550-I1

30-71 21 Street

Queens, NY 11102

New building · status dated Oct 28, 2026

Current record
Under review
Proposed scale
8 stories
Dwelling units
61
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01360550-I1 as a new building at 30-71 21 Street, Queens, NY 11102. Its latest published status category is Under review, dated Oct 28, 2026. The filing records 8 proposed stories and 61 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Oct 28, 2026
Proposed scale
8 proposed stories and 61 proposed dwelling units
Applicant of recordSee the 1 filings that name Papa Architecture PC
FiledMay 4, 2026
Current recordUnder review
Proposed scale8 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Proposed 8-story concrete 61-unit multiple dwelling with accessory parking for 14 vehicles and 32 bicycles

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a vacant land on a 10,000 sq ft lot.

Last altered
2023
Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
R7A
Lot area
10,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Feb 28, 2023.

  • Construction

    Issued Feb 28, 2023 — BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR APPLICATIONS# Q00627086-S 1-FO & Q00627086-I1-SE DUE TO CONTRACTOR WITHDRAWAL

  • Construction

    Issued Feb 28, 2023 — BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR APPLICATION # Q00450694-I1-FN DUE TO GENERAL CONTRACTOR WITHDRAWAL

  • Construction

    Issued Feb 28, 2023 — BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # Q00677444-I 1-FO. DUE TO GENERAL CONTRACTOR WITHDRAWAL.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 30, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01360550-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01360550-I1
BIN
4626200
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
8
Existing dwelling units
Empty in the source
Proposed dwelling units
61
General construction