What the filing says
A public-record reading of the proposed work.
Installation of hdsb and pipe scaffold as per plans. no change in use, occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 NYC building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 1932, with 103 homes, on a 22,000 sq ft lot.
- Built
- 1932
- Floors
- 5
- Residential units
- 103
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R2
- Lot area
- 22,000 sq ft
- Building area
- 96,780 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 29 notices on file; the most recent was issued Mar 13, 2024.
- Construction
Issued Mar 13, 2024 — .EMERGENCY WORK ORDER DUE TO SEVERLY BULGING MASONRY AT ALL EXPOSURE CRACKED/SPALLING TERRACOTTA AT EXPOSURE 1 (EAST)AND CRACKED MASONRY AT EXPOSURE#2 (SOUTH)&EXPOSURE#4 (NORTH).REMEDY:MAKE IMMEDIATE REPAIRS UNDER SUPERV.OF LIC.PROF.ALSO REMOVE/SECURE ANY LOOSE MATERIALS.IMMED PROVIDE SHED@EXPO#1/2/4 AND CONTROOED ACCESS AT EXPO#3 (WEST ELEV.)
- Local law 10/81 -
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01489905-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01489905-I1
- BIN
- 5000527
- BBL
- 5000280077
- Postal code
- 10301 · 255 filings
- Review type
- Professional Certification
- Existing stories
- 70
- Proposed stories
- 70
- Existing dwelling units
- 103
- Proposed dwelling units
- 103