What the filing says
A public-record reading of the proposed work.
Direct replacement of bathroom fixtures and installation of new washer in conjunction with interior renovation of existing dwelling unit '8a'. no change of use, egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story elevator apartment building built in 1955, with 100 homes, on a 12,569 sq ft lot.
- Built
- 1955
- Floors
- 16
- Residential units
- 100
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C5-1
- Lot area
- 12,569 sq ft
- Building area
- 163,787 sq ft
- Historic district
- Upper East Side Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 47 notices on file; the most recent was issued Feb 18, 2022.
- Hazardous condition (facade)
Issued Feb 18, 2022 — CYCLE 9A UNSAFE REPORT FILED
- Failure to post energy
Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01444784-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01444784-S1
- BBL
- 1013760051
- Postal code
- 10065 · 481 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 97
- Proposed dwelling units
- 97








