NYC DOB record · B00343698-P1

30 Kent Street

30 Kent Street, Brooklyn, NY 11222

Alteration filing in Greenpoint, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00343698-P1

30 Kent Street

Brooklyn, NY 11222

Alteration filing · status dated Mar 16, 2021

Current record
Approved
Proposed scale
Not stated
Dwelling units
80
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00343698-P1 as a alteration filing at 30 Kent Street, Brooklyn, NY 11222. Its latest published status category is Approved, dated Mar 16, 2021. The filing records 80 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Mar 16, 2021
Proposed scale
80 proposed dwelling units
Complete building dossierView all 7 filings associated with BIN 3336994Applicant of recordSee the 504 filings that name Patuxent Engineering LLC
FiledMar 15, 2021
Current recordApproved
Proposed scale80 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of support scaffold in accordance with nycc 2014 chapter 33. no change in egress, use, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 11-story elevator apartment building built in 2019, with 80 homes, on a 22,231 sq ft lot.

Built
2019
Floors
11
Residential units
80
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
22,231 sq ft
Building area
84,555 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 2 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00343698-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00343698-P1
BBL
3025560045
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
80