What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed for remedial repairs. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1915, with 37 homes, on a 12,066 sq ft lot.
- Built
- 1915
- Floors
- 5
- Residential units
- 37
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 12,066 sq ft
- Building area
- 42,290 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 6 notices on file; the most recent was issued Jul 6, 2020.
- Construction
Issued Jul 6, 2020 — STRUCTURE RENDERED NON-COMPLIANT. AT APT E7, WALLS AND CEILINGS HAVE BEEN REMOVED, ROOF OPEN, SMOKE DAMAGE THROUGHOUT, ALSO IN APT E8 IN BEDROOM, CEILING OPEN, WINDOW OUT AND OPEN ROOF ABOVE DUE TO FIRE AND FIRE FIGHTING OPERATIONS AT 30 LINDEN BLVD.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00367329-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00367329-I1
- BBL
- 3050860022
- Postal code
- 11226 · 2416 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 37
- Proposed dwelling units
- 37








