What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1930, with 42 homes, on a 8,300 sq ft lot.
- Built
- 1930
- Last altered
- 1988
- Floors
- 6
- Residential units
- 42
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-2
- Lot area
- 8,300 sq ft
- Building area
- 35,310 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 32 notices on file; the most recent was issued May 29, 2026.
- Construction
Issued May 29, 2026 — EMERGENCY WORK ORDER DUE TO CRACKED/DISPLACED BRICK @ FIRE ESCAPE/ WINDOW SPANDRELS MULT LOC. EXP1W IMMINENT HAZARD TO THE PUBLIC RIGHT IF WAT, REMEDY: IMMEDIATELY TAKE/PROVIDE ADEQ SAFETY MEASURES TO SECURE/PROTECT PUBLIC & INSTALL PUB PROTECTION EXP1W. ALSO MAKE ADEQUA REPAIRS TO DEFECTIVE FACADE U/SUPV OF NYS LICENSED PROFESSIONAL
- Construction
Issued Sep 23, 2025 — AT THE TIME OF INSPECTION,OBSERVED AT EXP3,A STONE RW HAS DISPLACE STO NE SECTIONS,SPALLED STONES,VERTICAL AND HORIZONTAL CRACKS AND MISSING MORTAR AT VARIOUS LOCATIONS.REMEDY:OWNER TO IMMEDIATELY RETAIN NYS PE TO ASSESS THE STRUCTURAL STABILITY OF THE RW AND SUBMIT SIGN & SEAL ST RUCTURAL ASSESSMENT REPORT NO LATER THAN 10/6/2025.IMPLEMENT SAFETY
- Construction
Issued Aug 7, 2024 — A CRACK WAS OBSERVED ON THE PARAPET WALL EXTENDING TO THE FA ADE ABOVE THE FIRE ESCAPE, POSING A SAFETY HAZARD FOR PEDESTRIANS AND POTENTIAL EMERGENCIES IN THE EVENT OF A FIRE. THIS CONDITION IS IN VIOLATION OF FAILURE TO MAINTAIN AS PER CODE 28-301.1. ENGINEERS REPORT REQUIRED WITHIN 30 DAYS
10 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01409584-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01409584-I1
- BIN
- 1064409
- BBL
- 1021800083
- Postal code
- 10033 · 122 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 43
- Proposed dwelling units
- 43