What the filing says
A public-record reading of the proposed work.
Installation of a temporarily supported scaffold, heavy-duty sidewalk shed and material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1920, with 40 homes, on a 12,995 sq ft lot.
- Built
- 1920
- Last altered
- 1990
- Floors
- 6
- Residential units
- 40
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 12,995 sq ft
- Building area
- 39,315 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 32 notices on file; the most recent was issued Oct 2, 2025.
- Construction
Issued Oct 2, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED STEP CRACKS, DAMAGED MORTAR JOINTS, SPALLED STONE WORK AND CRACKED BRICK WORK ON EXPOSURE 1. REMEDY: REPAIR AND/OR REPLACE
- Elevator
Issued Aug 2, 2021
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01271215-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01271215-I1
- BIN
- 2001963
- BBL
- 2024220021
- Postal code
- 10451 · 168 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 44
- Proposed dwelling units
- 44