What the filing says
A public-record reading of the proposed work.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story condominium built in 2006, with 91 homes, on a 20,183 sq ft lot.
- Built
- 2006
- Floors
- 12
- Residential units
- 91
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R8A
- Lot area
- 20,183 sq ft
- Building area
- 153,681 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 62 notices on file; the most recent was issued Aug 12, 2026.
- Construction
Issued Aug 12, 2026 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION #M00453703-I1 DUE TO SPECIAL INSPECTOR WITHDRAWAL.
- Construction
Issued Jul 21, 2015 — DUE TO VEHICLE STRIKING SIDEWALK SHED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01455037-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01455037-I1
- BBL
- 1019457504
- Postal code
- 10026 · 149 filings
- Review type
- Professional Certification
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 91
- Proposed dwelling units
- 91