NYC DOB record · X01409693-I1

3029 Briggs Avenue

3029 Briggs Avenue, Bronx, NY 10458

Alteration filing in Bedford Park, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01409693-I1

3029 Briggs Avenue

Bronx, NY 10458

Alteration filing · status dated Oct 15, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
51
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01409693-I1 as a alteration filing at 3029 Briggs Avenue, Bronx, NY 10458. Its latest published status category is Approved, dated Oct 15, 2026. The filing records 6 proposed stories and 51 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 15, 2026
Proposed scale
6 proposed stories and 51 proposed dwelling units
Applicant of recordSee the 207 filings that name Asr Engineering PC
FiledJun 16, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$54,570

What the filing says

A public-record reading of the proposed work.

Application for faade repair work- at exposure #1, step cracks visible on frontfacade, also repair fire escape's obstructed by household items & a/cunits, to comply ecb violation031326cer01sm / 377333,39180419n, 39180418l. no change in use, egress, orocc

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story walk-up apartment building built in 1922, with 52 homes, on a 9,057 sq ft lot.

Built
1922
Floors
6
Residential units
52
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R8
Lot area
9,057 sq ft
Building area
41,900 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 7 notices on file; the most recent was issued May 15, 2026.

  • Construction

    Issued May 15, 2026 — FTC WITH COMMISSIONER'S CONTROL#348133 VIO#032426PI20701AG DATED 03/24/26 REQUIRING THE WONER TO PROVIDE A CORRECTIVE ACTION PLAN BY 04/24/26. AS OF 05/15/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348133 VIO#032426PI20701AG

  • Construction

    Issued Mar 24, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP2 LOCALIZED BULGING BTWN THE 4FL & 5FL WINDOW OPENINGS NEAR EXP2/3 CORNER RESULTING IN MISALIGNED WINDOW FRAMES ALONG W/MASONRY HAIRLINE CRACK ABOVE 3FL WINDOW OPENING OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB & NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY APRIL 24 2026

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01409693-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 82,285 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01409693-I1
BIN
2017258
BBL
2033080065
Review type
Professional Certification
Existing stories
6
Proposed stories
6
Existing dwelling units
51
Proposed dwelling units
51
General construction