What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1922, with 62 homes, on a 15,080 sq ft lot.
- Built
- 1922
- Floors
- 5
- Residential units
- 62
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 15,080 sq ft
- Building area
- 69,336 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 12 open notices on record for this building, out of 24 notices on file; the most recent was issued May 29, 2026.
- Construction
Issued May 29, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#348549 VIO#042326PI20704HZ DATED 04/23/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 04/30/26. AS OF 05/29/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348549 & VIO#042326PI20704HZ
- Construction
Issued Apr 23, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD ALONG EXP1,2,3 VERT STEP CRACKS W/ BRICKS & MORTAR, BULGING BRICKS-MORTARLINTEL ABOVE 5TH F; WINDOW FAR HALLWAY @ INNER COURTYARD. MORTAR SEPARATION ALONG THE 5FL WINDOW HEADERS. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB &NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
9 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01393709-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01393709-I1
- BBL
- 2033310001
- Postal code
- 10467 · 290 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 62
- Proposed dwelling units
- 62