What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1926, with 27 homes, on a 6,825 sq ft lot.
- Built
- 1926
- Floors
- 4
- Residential units
- 27
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R4A
- Lot area
- 6,825 sq ft
- Building area
- 24,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 14 notices on file; the most recent was issued Oct 3, 2025.
- Construction
Issued Oct 3, 2025 — FAILURE TO FILE AN ANNUAL PARAPET WALL OBSERVATION REPORT FOR 2024 AS REQUIRED BY 28-301.1.1.
- Construction
Issued Sep 12, 2025 — ADDITIONAL INFORMATION.DUE TO A FIRE WHICH OCCURRED ON 1/15/24,OBSERVD BLDG IN A STATE OF DISREPAIR W/ROOF FRAMNG CHARRED THROUGHOUT.FIRE, WATER,&SMOKE DMG THROUGHOUT BLDG,WNDWS OUT@3RD&4TH FLR.OWNR TO ENGAGE NYSPE W/O DISCIPLINRY ACTION TO EVAL THE ENT BLDG STRCTRE,INCLDNG ROOF/CCKLFT FRAMING&TOP FL MASNRY WALLS
- Construction
Issued Feb 19, 2025 — FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR DUE TO FIRE W/ROOF FRAMNG CHARRD THRUOUT,FIRE,WATER,&SMOKE DMG THRUOUT BLDG,WNDWS OUT@3RD&4THFL.PRTL CLLPSE OF CCKLFT.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #011625FEU20502AK (CONTROL #341913) IMMEDIATELY
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 13, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01168459-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01168459-I1
- BBL
- 2032570001
- Postal code
- 10463 · 453 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 27
- Proposed dwelling units
- 27