What the filing says
A public-record reading of the proposed work.
Plumbing filing limited to new plumbing fixtures, sanitary, waste and vent piping associated with the MTA tenant fit-out. New Electric Hot water heaters, no gas piping and no medical gases.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story office building built in 1917, on a 103,000 sq ft lot.
- Built
- 1917
- Last altered
- 2012
- Floors
- 7
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-5
- Lot area
- 103,000 sq ft
- Building area
- 246,835 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 100 notices on file; the most recent was issued Sep 28, 1988.
- Elevator
Issued Sep 28, 1988 — (51)FILE A BN & OBTAIN A PERMIT FOR F263 DISMANTLED ELEV. OR RESTORE TO SERVICE.(52)REMOVE ALL STORAGE IN FRONT SHAFTWAY DOOR & BLOCKING OF SAME IN BSMT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01463998-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01463998-I1
- BBL
- 4002390060
- Postal code
- 11101 · 460 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0