What the filing says
A public-record reading of the proposed work.
Rebuild Exterior Exposure #2 Wall on Roof Level, and Install new Roof
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1899, on a 1,700 sq ft lot.
- Built
- 1899
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R6B
- Lot area
- 1,700 sq ft
- Building area
- 2,295 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 7 notices on file; the most recent was issued Dec 9, 2025.
- Immediate
Issued Dec 9, 2025 — IMMEDIATELY INSTALL 2 LINES OF TEMPORARY SHORING ALONG EXPOSURE 2, FROM CELLAR UP UNDERSIDE OF ROOF, EXTENDING THE FULL LENGTH OF THE BUILDING FROM FRONT TO BACK. INSTALL TRANSVERSE CROSS BRACING BETWEEN THE 2 LINES OF SHORING. AFTER SHORING IS INSTALLED, PARTIALLY
- Construction
Issued Dec 8, 2025 — EMERGENCY WORK ORDER.ON/AROUND 11/28/25,EXP2,8INCH BEARNG APPRX 15 LF CLLPSD ONTO ADJ 303 ROOF.REMAINING EXP2 WALL CRCKD&SEVERELY BULGNG OUT &AT RISK OF CLLPSE.EXP2 RUBBLE FDN WALL PRTLLY.OWNR TO IMMED RETAIN NYSPE&GC ENDRSD FOR DEMO TO 1.PE TO PRVDE MEANS&METHDS TO DOB-FEU FOR REVIEW&APPRVL
- Construction
Issued Dec 4, 2025 — EMERGENCY WORK ORDER.ON/AROUND 11/28/25 EXP2 WALL@2ND FLOOR PARTIALLY CLLPSD ONTO ADJ 303 VAM BUREN ROOF.035 EXP2 WALL@RISK OF FURTHER CLLPSE.ROOF&BLDG STRCTRLLY CMPRMSD&POSES DNGR TO THE PUBLIC IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 350221 (112825FEU30301PN) DATED 11/28/2025
3 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01437794-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01437794-I1
- BIN
- 3043617
- BBL
- 3016100063
- Postal code
- 11221 · 2353 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 2