What the filing says
A public-record reading of the proposed work.
Construction of curb cut which provides access to interior loading area within building
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story theatre built in 2018, on a 95,000 sq ft lot.
- Built
- 2018
- Last altered
- 2017
- Floors
- 6
- Residential units
- 0
- Building type
- Theatre
- Land use
- Commercial and office
- Zoning district
- M3-1
- Lot area
- 95,000 sq ft
- Building area
- 189,091 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 12 open notices on record for this building, out of 32 notices on file; the most recent was issued Jun 24, 2020.
- Construction
Issued Jun 24, 2020 — FTM-COMCR BLD@NW CRNR LOT ADDNG 4FLS W/O PERMT.TIME INSPET CMU INSTL @ VERT ADDITION,NOT CODE COMPLT,CNY WALL TIES NO MOVT IN BOTH DIRECT STRCTRL STEEL W/O PRMT NOT CODE COMPL.BEAMS IMPROP CONNECT'D TO CONC STRUCT.NYSPE IMMED EVALU ENTIRE BLDG.PROV.REPAIRS CODE COMPLIANCE UNDR PRMT PER EVAL COMPLT RPRS UNDER PRMT & SIGNOFF BY 12/21/2020
- (other bldgs types) - elevator affirmation of
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
- Construction
Issued Jul 23, 2019 — INSP *2018 -FTM- 6 STRY NEW BLDG CONSTRUCTED W/OUT PERMIT ON EAST SIDE CRNR LOT.STEEL FRAM'G INSTALLED W/OUT PERMIT.ALL SLAB CANTILEVER BEAMS MISSING MOMENT CONNECTIONS.COLUMNS NOT BEAR@ALL SPLICES.NUTS NOT FULLY ENGAGED.PE IMMED EVALU ENTIRE BLDG.PROV REPRS UNDR PERMIT PER PE EVALU TO ACHIEVE CODE COMPLIANCE.CMPLT REPRS UNDR PERMIT&SIGNOFF BY 12/21/20
9 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00491105-I1.
- Current status updated02
The latest recorded filing status is “Objections.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00491105-I1
- BBL
- 3026070006
- Postal code
- 11222 · 3149 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0