NYC DOB record · M01439166-I1

307 East 93 Street

307 East 93 Street, Manhattan, NY 10128

Alteration filing in Upper East Side-Yorkville, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01439166-I1

307 East 93 Street

Manhattan, NY 10128

Alteration filing · status dated Oct 29, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
15
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01439166-I1 as a alteration filing at 307 East 93 Street, Manhattan, NY 10128. Its latest published status category is Approved, dated Oct 29, 2026. The filing records 5 proposed stories and 15 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 29, 2026
Proposed scale
5 proposed stories and 15 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1050276Applicant of recordSee the 1016 filings that name Always Fast Services Corp
FiledAug 4, 2026
Current recordApproved
Proposed scale5 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1920, with 15 homes, on a 2,517 sq ft lot.

Built
1920
Last altered
1988
Floors
5
Residential units
15
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R8B
Lot area
2,517 sq ft
Building area
6,880 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 17 notices on file; the most recent was issued Aug 7, 2026.

  • Construction

    Issued Aug 7, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#370386 VIO#073026PI10801HZ DATED 07/20/2026 REQUIRING OWNER TO PROVIDE A CORRECTIE ACTION PLAN BY 08/03/2026. THE REQ'D CAP WAS NOT REC'D AS OF 08/07/2026. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#370386 VIO#073026PI10801HZ

  • Construction

    Issued Jul 30, 2026 — CORRECTIVE ACTION PLAN REQ'D-HAZ CONIDTIONS OBSVD ALONG THE FRONT EXP1 THE LEFT SIDE CORNER DISPLAYS A 1/2 INCH VERT BRICK AND MORTAR CRACK ABOUT 30FT IN LENGTH,CRACKED STONE WINDOW SILLS,VERT BRICK STEP CRACKS OWNER TOIMMED RETAIN REG DESIGN PROF IN GOOD STANDING WITH DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY 08/03/2026

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01439166-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01439166-I1
BBL
1015560006
Review type
Professional Certification
Existing stories
5
Proposed stories
5
Existing dwelling units
15
Proposed dwelling units
15
Sidewalk shed