What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress under this application, all work to comply with chapter 33 of nycbc.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story mainly residential with some commercial built in 1927, on a 2,808 sq ft lot.
- Built
- 1927
- Floors
- 2
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R5
- Lot area
- 2,808 sq ft
- Building area
- 3,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 31 open notices on record for this building, out of 33 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Immediate
Issued May 20, 2025 — INSTALL SIDEWALK SHED APPROXIMATELY 135 LINEAR FEET. 35 FEET AT EXPOSU RE #1 TO WRAP AROUND AND 100 FEET AT EXPOSURE #2 TO SAFEGUARD PUBLIC AND PROPERTY
- Construction
Issued May 20, 2025 — OWNER TO HIRE A NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUILDINGS.NYC.GOV WITH IN 5 DAYS, ADDRESSING ALL CONDITIONS W/PLANS, PHOTOS, RECOMMENDING TIME FRAME AND REPAIRS TO BE COMPLETED.
28 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01230788-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01230788-I1
- BIN
- 3330941
- BBL
- 3088000074
- Postal code
- 11235 · 1783 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








