NYC DOB record · M00791192-S8

309 Avenue of the Americas

309 Avenue of the Americas, Manhattan, NY 10014

New building filing in West Village, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00791192-S8

309 Avenue of the Americas

Manhattan, NY 10014

New building · status dated Oct 5, 2026

Current record
Approved
Proposed scale
7 stories
Dwelling units
16
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00791192-S8 as a new building at 309 Avenue of the Americas, Manhattan, NY 10014. Its latest published status category is Approved, dated Oct 5, 2026. The filing records 7 proposed stories and 16 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 5, 2026
Proposed scale
7 proposed stories and 16 proposed dwelling units
Applicant of recordSee the 156 filings that name Lombardo Professional Engineering
FiledOct 5, 2026
Current recordApproved
Proposed scale7 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 10 notices on file; the most recent was issued Jun 26, 2025.

  • Plumbing

    Issued Jun 26, 2025 — THE DEPARTMENT OF BUILDINGS ORDERS ALL PLUMBING WORK UNDER PERMIT NUMBER 102470513 STOPPED IMMEDIATELY DUE TO THE INACTIVE LMP # 1343

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00791192-S8.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00791192-S8
BIN
1091878
BBL
1005890039
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
7
Existing dwelling units
Empty in the source
Proposed dwelling units
16