What the filing says
A public-record reading of the proposed work.
Replace bricks, stitch cracks, replace sills, parge concrete, provide vertical sealant joints, replace missing a/c sleeve covers, recaulk balcony rail posts, remove existing and provide new sealant at a/c sleeves. No change of use occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 24-story elevator apartment building built in 1963, with 326 homes, on a 99,953 sq ft lot.
- Built
- 1963
- Last altered
- 2007
- Floors
- 24
- Residential units
- 326
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 99,953 sq ft
- Building area
- 370,990 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 98 notices on file; the most recent was issued Nov 12, 2025.
- Construction
Issued Nov 12, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AT EXPOSURE 1 EAST ELEVATION FLAKING PAINT AT BALCONY. EXPOSURE 3 WEST ELEVATION DEFECTED BALCONY SLAB AT THE 21ST FLOOR. REMEDY: REPAIR AND OR REPLACE
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00620359-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00620359-P1
- BBL
- 3019330060
- Postal code
- 11238 · 2783 filings
- Review type
- Standard Plan Examination
- Existing stories
- 24
- Proposed stories
- 24
- Existing dwelling units
- 327
- Proposed dwelling units
- 327








