What the filing says
A public-record reading of the proposed work.
Proposed support of excavation, foundation and structural work in conjunction with new building. As per plan, no change of use, occupancy, egress.
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a elevator apartment building built in 2025, with 10 homes, on a 4,328 sq ft lot.
- Built
- 2025
- Residential units
- 10
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 4,328 sq ft
- Building area
- 9,423 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Dec 10, 2025.
- Construction
Issued Dec 10, 2025 — AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE,5STORY NB STEEL STRCTRL CMPLTN BULKHD.OBSRVD A)@EXP#4 STEEL PANEL STAIRCASE IN PLACE FRM 1STFL TO ROOF, B)CMU BLOCK MASNRY WALLS ELEVATR SHAFT 1ST.STOP ALL INTERIOR WORK IMMEDIATELY.KEEP STEEL COLUMNS AND BEAMS EXPOSE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q00586894-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,058 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q00586894-S1
- BIN
- 4621021
- BBL
- 4044090021
- Postal code
- 11354 · 370 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- 5
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 10