What the filing says
A public-record reading of the proposed work.
Proposed installation of temporary pipe scaffolding on the roof as per plans submitted. work shall comply with 2014 building codes, chapter 33. no changes in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 21-story elevator apartment building built in 1965, with 772 homes, on a 257,500 sq ft lot.
- Built
- 1965
- Floors
- 21
- Residential units
- 772
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 257,500 sq ft
- Building area
- 751,412 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 82 notices on file; the most recent was issued May 16, 2024.
- Construction
Issued May 16, 2024 — AT TIME OF INSPECTION OBSERVED @ EXP 1(S ELEV) & EXP 4(EAST ELEVATION) & EXP 3 (NORTH ELEVATION).MISSING BRICKS AT MULTIPLE FLOORS. AT EXP 2 (WEST ELEVATION) & EXP 4 (EAST ELEVATOPM) MISSING BRICKS AT MULTIPLE FLOORS. REMEDY: REPAIR AND/OR REPLACE DAMAGE FACADE
- Hazardous condition (facade)
Issued Feb 21, 2023 — CYCLE 9B UNSAFE REPORT FILED
- Facade safety program
Issued Aug 14, 2019
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00478998-I1.
- Current status updated02
The latest recorded filing status is “Objections.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00478998-I1
- BBL
- 3030770001
- Postal code
- 11206 · 3022 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 387
- Proposed dwelling units
- 387








