What the filing says
A public-record reading of the proposed work.
CIVIL-GC for NYCHA Ocean Hill Apartments - On-site green infrastructure practice which involves construction of OCEAN-04SRa: proposed subsurface slow-release/detention in parking lot for collection of rain water. Existing storm water system to be modified
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 14-story elevator apartment building built in 1966, with 160 homes, on a 79,000 sq ft lot.
- Built
- 1966
- Floors
- 14
- Residential units
- 160
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 79,000 sq ft
- Building area
- 149,772 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 10 notices on file; the most recent was issued Jun 3, 2025.
- Construction
Issued Jun 3, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.EXPS 1,2,3,4: SPALLED/SPALLING, CRACKED ROOF DECK OVERHANG. ON ALL FOUR ELEVATION RO OF SPALLED/SPALLING BRICKS ON BULKHEADD/WATER TOWN BRICK ESPOSURE REMEDY: REPAIR AND/ON REPLACE ALL DAMAGED CONCRETE ROOF OVER HANG
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- Facade safety program
Issued Apr 17, 2019
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00653772-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00653772-I1
- BBL
- 3015290001
- Postal code
- 11233 · 2191 filings
- Review type
- Professional Certification
- Existing stories
- 14
- Proposed stories
- 14
- Existing dwelling units
- 79
- Proposed dwelling units
- 79