What the filing says
A public-record reading of the proposed work.
Facade repair as per plans includes brick & sill pointing. brick replacement, lintel replacement, lintel scrape & paint, window sill replacement, sealant replacement. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1956, with 102 homes, on a 31,300 sq ft lot.
- Built
- 1956
- Floors
- 7
- Residential units
- 102
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 31,300 sq ft
- Building area
- 121,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 29 notices on file; the most recent was issued Sep 10, 2022.
- Construction
Issued Sep 10, 2022 — SPECIAL INSPECTOR, ALBERTO ROMAN, PE#95364 SURRENDERED ALL FILING PRIVILEGES, THEREFORE PURSUANT TO AC 28-105.10.2 BOROUGH COMMISSIONER HAS ORDERED SWO UNDER APPLICATION #B00592430.
- Construction
Issued Sep 10, 2022 — SPECIAL INSPECTOR, ALBERTO ROMAN, PE#95364 SURRENDERED ALL FILING PRIVILEGES, THEREFORE PURSUANT TO AC 28-105.10.2 BOROUGH COMMISSIONER HAS ORDERED SWO UNDER APPLICATION #B00592430.
- Hazardous condition (facade)
Issued Feb 21, 2022 — CYCLE 9A UNSAFE REPORT FILED
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01484107-I1.
- Current status updated02
The latest recorded filing status is “Pending Plan Examiner Assignment.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01484107-I1
- BBL
- 3086790007
- Postal code
- 11235 · 2021 filings
- Review type
- Standard Plan Examination
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 102
- Proposed dwelling units
- 102