NYC DOB record · X01429081-I1

311 Bedford Park Boulevard

311 Bedford Park Boulevard, Bronx, NY 10458

Alteration filing in Bedford Park, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01429081-I1

311 Bedford Park Boulevard

Bronx, NY 10458

Alteration filing · status dated Aug 25, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
50
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01429081-I1 as a alteration filing at 311 Bedford Park Boulevard, Bronx, NY 10458. Its latest published status category is Approved, dated Aug 25, 2026. The filing records 6 proposed stories and 50 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 25, 2026
Proposed scale
6 proposed stories and 50 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 2016747
FiledAug 4, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$175,000

What the filing says

A public-record reading of the proposed work.

Filing for facade repairs work that includes replacement of masonry parapet wall(s), replacement of cracked brickwork, replacement of steel lintels, repair of eroded mortar joints, and miscellaneous masonry repairs throughout facades,

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1937, with 51 homes, on a 14,490 sq ft lot.

Built
1937
Floors
6
Residential units
51
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7A
Lot area
14,490 sq ft
Building area
63,564 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 34 notices on file; the most recent was issued Mar 13, 2026.

  • Construction

    Issued Mar 13, 2026 — EWO DUE TO SEVERELY CRACKED & DISPLACED BRICK MASONRY @ PARAPET LEVEL ALONG 6FL LINTEL LINE @ EXP4S. IMMINENT HAZARD TO PUBLIC RIGHT OF WAY REMEDY: IMMEDIATELY TAKE/PROVIDE SAFETY MEASURES TO SECURE/PROTECT PUBLIC & INSTALL PUBLIC PROTECTION AT THE FULL LENGTH OF EXP4S (PERRY AV.MAKE REPAIRS TO DEFECTIVE FACADE U/FULL SUPERVISION OF NYS LIC PROF

  • Failure to post energy

    Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to post energy

    Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01429081-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01429081-I1
BBL
2032920062
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
50
Proposed dwelling units
50
General construction